We were delighted to receive approval from Guildford Borough Council for our development of 3 new homes at Horseshoe Lane West. When we were introduced to the site it had an existing approval for 4 new homes which we felt was far too congested and was not sympathetic to the local area. In reducing the[…]
Posts by:
Aspen Homes
We are delighted with the progress of the brickwork on the six new houses at Willow Place, Guildford. The recent run of good weather has enabled us to push on with the works at site and reach first floor level on Plots 5 and 6. The carpenters are now underway with installing the joists for[…]
Aspen Homes would like to provide prior warning that on Thursday 13th, Friday 14th and Monday 17th July we will have a piling rig on site at Tretower House to begin the foundations on the 6 new homes. When the rig is in operation it will create noise and vibration. Rest assured these vibrations are[…]
This week we have had a concrete rig at Willow Place to pour the mats on which the foundations of the 6 new homes will be built. This is always an exciting time as you can begin to see the footprint of the properties and get a real feel for the size of them! Now[…]
With work on the road and utilities now complete, the Aspen Homes team have turned their attention to the renovation of Tretower House. The house has been taken back to the studs to allow us to properly inspect the state of the property. New steel, concrete and timber lintels have begun to be installed to[…]
With the surface water drainage system and road base now in place, we have had contractors on site to install kerbs and pour tarmac on the road base. This can now be used as our temporary construction road for deliveries and vehicular access throughout the project. Once construction is finished at Willow Place, the road[…]
It has been an extremely productive few weeks for the Aspen Homes team, with utilities being laid at Willow Place alongside the installation of the surface water drainage system within the new road that will serve the future properties. Due to our commitments to sustainability there is no gas at Willow Place, however water and[…]
Our team on site at Willow Place, Guildford have begun the groundworks phase over the past few weeks during which they have been conscious of the presence of toads in their area of work. Before each stage of work the team have conducted a sweep of the area which has led to a couple of[…]
With work well underway on site at Tretower House, we have turned our attention to the marketing of the future homes. After some thought, it was decided that the new development will be named Willow Place. Willow Place will be an exclusive cul-de-sac consisting of just six family homes in Merrow, Guildford. With Merrow Downs[…]
We are delighted to be underway on site at Tretower House. Since March we have been extremely busy leveling out the site, ready for the future houses to be built. We have also dug trenches in order to bring electric, water and broadband infrastructure onto site. As we move into April we will be completing[…]
We’ve been very busy over the last few months preparing for the start of development at Tretower. One aspect that is hugely important to us is the ecological value the development will offer. As a result of this we’ve spent time on site with the local Toad Wardens erecting the amphibian fencing to the western[…]
We were delighted to receive planning permission for the development of 6 new homes on land at Tretower House, Guildford. This will be a mixed scheme of 3, 4 and 5 bedroom homes designed and built to the Aspen Homes standard. For more information on the project at Tretower House, alongside regular updates, please visit[…]
As a developer it is our duty to ensure that our projects are as environmentally friendly as possible, both during building and after. At Tretower House we have pledged to achieve a biodiversity net gain on the site through an abundance of means. These include, but are not limited to: Amphibian fencing around the construction[…]
Last night we attended the Guildford Borough Council planning committee meeting where the committee were discussing and voting on our proposed development at Tretower House, Guildford. We were delighted to receive a unanimous vote in favour of the development of 6 new houses. With permission now in place, our focus turns to conducting site surveys[…]
Two weeks ago our Managing Director Joe Jelley and his teammates embarked on the Three Peaks Challenge, with the aim of climbing Ben Nevis, Scaffell Pike and Mount Snowdon all within 24 hours. The team were successful in their challenge, all whilst raising over £30,000 for charity, a fantastic effort all round. Reflecting upon the[…]