Road Surface at Willow Place, Guildford
Jun 24, 2023 By Aspen Homes In Latest News
With the surface water drainage system and road base now in place, we have had contractors on site to install kerbs and pour tarmac on the road base. This can now be used as our temporary construction road for deliveries and vehicular access throughout the project. Once construction is finished at Willow Place, the road surface will then be finished off with block paving to bring an exclusive feel to the development.
Leave a comment